Ozone Wellness

About This Project

This was a new internal fitout that we did into 2 empty premises on the second floor that we joined together which involved moving steel cols and beams. The main criteria was all rooms had to be nearly 100% soundproof so walls were done in 4 layers of soundcheck board and baffles installed on top of walls to underside of ceiling. It also contained 2 massive float tanks that came from America and had to be brought into premises in pieces to get it to fit. A very challenging job.